TERACO ISANDO
Ardagh Glass
PEPKOR
SHOPRITE
TERACO JB1 & JB3
TERACO ISANDO
Opened in May 2017, the second phase of Teraco’s data centre added an impressive 5 000 m² of floor space to the existing building. With a focus on interconnected IT networks, Teraco needed ‘always on’ infrastructure. In addition to the 20MVA of power supplied to the site, a backup generator was essential.
As Teraco offers around-the-clock assistance to clients, diesel generators were installed to provide full capacity for five days, in case of any unexpected electricity failures. Extensive generation units and diesel supplies also formed part of the installation. The statistics are impressive and test the boundaries of load carrying. The building was constructed using more than 12 000 m3 of concrete and is reinforced with 12 000 tons of steel.
Ardagh Glass
(Previously Consol Glass)
Client: Ardagh Glass Packaging-Africa
Completed: January 2024
Abbeydale constructed the new facility for Ardagh Glass Packaging-Africa. This included the heat-up of the N3 furnace at the Nigel production facility. It comprises a new furnace and four production lines. The expansion will add 50 percent more output to the facility’s production, making Nigel the largest glass container production facility in Africa and one of the largest and most efficient facilities globally.
PEPKOR
Recently completed, this flagship development has a total building area of 149 259 m²
Project Value: R 953 million excl Vat, which includes a significant “mid-contract” soil improvement project.
Size: Distribution warehouse measuring 105 770 m² (17.35m clear height), including 49 000m² of mezzanine slab and
3 200m² of offices.
Handover date: June 2023
Structural design philosophy:
This entailed 2731 tons of structural steelwork being erected simultaneously with 49 000 m² of reinforced concrete mezzanine slab.
Shoprite, Riverfields
Client: Shoprite / Equites
Project Value: R 830 million excl vat
Size: 92 000m² distribution warehouse, including 7 100m² offices, 6 550 m² of structured parking and 77 000 m² of external works.
Handover to Shoprite: December 2023
External Works: April 2024
Design philosophy:
This fast-track project has seen monthly payment certificates exceeding R100m. The concrete frame was largely constructed using tilt-up. Included in the facility is a 17 000 m² an ammonia “Freshmark” refrigerated and insulated building. Included is a 10 000 m² “equipment returns and crate wash” facilit
Teraco JB1
& Teraco JB3
Completion Date: 2020
Project Value: R451 m excl vat
Size: A capacity of 40MW, 45 000 m² of space and offices ,
Which includes 21 000 m² of data hall space contained within 22 data halls.
Design philosophy:
This facility provides the cloud on-ramps for Amazon, Google, Microsoft’s Azure and forms a vital part of the Africa's internet backbone.